1) Insulated headers
2) 24″ on center 2×6 studs
3) windows placed and sized so as to minimize extra studs.
The main reason for advanced framing is to minimize thermal bridging, side benefit: less wood used.
August 3, 2011 by sarah
1) Insulated headers
2) 24″ on center 2×6 studs
3) windows placed and sized so as to minimize extra studs.
The main reason for advanced framing is to minimize thermal bridging, side benefit: less wood used.
Leave a Reply