The windows are in and the mesh has been inspected. They are getting ready for the first coat of structural lime plaster on inside and outside.




March 26, 2021 by sarah
The windows are in and the mesh has been inspected. They are getting ready for the first coat of structural lime plaster on inside and outside.




Posted in Design Projects | Leave a Comment
This site uses Akismet to reduce spam. Learn how your comment data is processed.
WPThemes.
Leave a comment